Worked example

A worked forward deployed engineer project, from request to handover

Most advice about forward deployed engineering says what to produce. This page shows one small project produced in full: what the customer asked for, what the questions turned up, what was agreed, what was built, what went wrong, and what was handed over.

Written by the DrillHall team. No practitioner has reviewed this page yet.

Read this first

  • It is invented. Kestrel Yard Hire does not exist. The people, dates and numbers are made up, and no real customer, traffic or on-call sits behind them.
  • It is not a DrillHall mission. We kept it separate on purpose, so it gives away nothing you are assessed on. It was not scored, and it is not a model answer to any mission.
  • The code is real. The excerpts were run before publishing: the test shown fails on the first version and passes on the corrected one.
  • The notes are our opinion. Each “What to notice” says how the document answers the questions in its public template.

1. The request

Kestrel Yard Hire is an invented equipment hire firm with six branches in Maharashtra. It rents excavators, lifts, compactors and breakers to building contractors.

“Contractors ring us all day to ask whether a machine is free. Put live availability on the website so they can book online. We need it before the building season starts in six weeks.”

Meera, sales director

The request names a solution (live availability, online booking) and a date. It does not say what problem the solution is for. The people involved:

  • Meera. Sales director, and the sponsor.
  • Arvind. Operations manager, responsible for the fleet in all six branches.
  • Lata. Finance controller.
  • Joseph. Branch manager, Nashik.

2. Customer brief

Written before the interviews, so that the interviews have something to prove wrong.

Customer brief and assumption register

Day 1, written from the request and one call with Meera, before talking to anyone else. Headings from the blank template.

Customer outcome

A contractor can see on the website whether a machine is free at a branch, and ask for it, without phoning.

Measure: the number of “is it free?” phone calls a week at the branches in the pilot, counted by counter staff on a tally sheet, against a count taken the week before the pilot starts.

Current workflow

  • Each branch keeps its fleet in its own spreadsheet. Counter staff mark a machine as out when it leaves and write the date it is due back.
  • The website shows the catalogue only. To find out whether a machine is free, a contractor phones the branch.
  • Head office receives the six spreadsheets by email once a week.

Assumptions

Stated by the customer: six branches; a six-week deadline; “about forty calls a day” (Meera's estimate, not a count).

  • Unconfirmed: the six spreadsheets have the same columns.
  • Unconfirmed: a spreadsheet is up to date during the working day.
  • Unconfirmed: a returned machine is free to hire as soon as it is back.
  • Unconfirmed: contractors want to book and pay online, not only to check.

Validation plan

  • Columns: ask Arvind for all six spreadsheets and compare the headers. If they differ, the first release covers fewer branches.
  • Freshness: sit at one counter for a morning and watch when the spreadsheet is changed. If it is changed once a day, “live” is not available at any price and the request has to be restated.
  • Returns: ask Arvind what happens between a machine coming back and going out again.
  • Booking: ask Lata what a wrong booking costs, and ask Meera which she would give up first, booking or the date.

What to notice. The template asks for an outcome you can measure and for assumptions kept apart from what the customer stated. Here the forty calls a day is marked as an estimate, and every assumption has a named person to ask and an answer that would change the plan.

3. Discovery

Five questions, what was heard, and what each answer changed. Three of the four assumptions in the brief turned out to be wrong.

Asked ofQuestionWhat was heardWhat it changed
MeeraWhen you say live, what is the oldest information you would be happy to show a contractor?“Not last week's. This morning's would be fine.” What she wants is fewer phone calls.“Live” became “this morning's”. The outcome is fewer calls, not online booking.
ArvindA machine comes back at four in the afternoon. When can it go out again?Not until it has been inspected, which is done the next morning. Some returns go to the workshop instead.Nobody knows availability more often than once a day. A faster feed would publish guesses.
JosephShow me when you change the spreadsheet on a busy day.At closing, and sometimes the next morning before opening. He will not enter the same thing in two places.Any design that adds a second place to type is out.
LataWhat does it cost when two contractors are promised the same machine?A refunded deposit, a free delivery, and usually the contractor. She would rather show a machine as unknown than promise it wrongly.When the data is in doubt the website must say “call the branch”. Taking payment online is out of the pilot.
ArvindCan I see all six spreadsheets?Four have the same columns. Two have extra columns added by their managers.The pilot starts with two of the four matching branches.

Discovery summary

Day 4, after five conversations and a morning at the Nashik counter. Headings from the blank template.

Outcomes

  • Fewer “is it free?” calls at the branches (Meera).
  • No contractor is promised a machine that is not there (Lata).
  • No extra typing for counter staff (Joseph, Arvind).

Constraints

  • Availability is known once a day, after the morning inspection. Confirmed by Arvind and seen at the Nashik counter.
  • The spreadsheets stay. Branch staff will not enter data twice. Confirmed by Joseph and Arvind.
  • Four of six spreadsheets share a layout. Confirmed by comparing the files.
  • Six weeks to the start of the building season. Stated by Meera.

Conflicts

Meera asked for live online booking. Arvind and Lata can only stand behind availability that is a day old, and Lata will not accept a wrong promise. Meera and Lata decide together; Meera chose fewer calls by the deadline over booking.

Open Questions

  • How many calls a week are really about availability? Matters because it is the measure. Counter staff will tally for a week before the pilot.
  • Who fixes a spreadsheet that cannot be read? Matters because the website depends on it every morning. Arvind to name a person per branch.
  • Do the two branches with extra columns want to join later? Matters for the plan after the pilot. Arvind to ask.

What to notice. The template asks who confirmed each constraint, where stakeholders pull against each other, and who decides. The conflict is written down with the decision and the person who made it, so the scope that follows is the customer's choice and not the engineer's.

4. Pilot scope

The sponsor asked for live booking at six branches. What was agreed is this morning's availability at two.

Pilot scope and acceptance criteria

Day 5, agreed with Meera, Arvind and Lata in one meeting. Headings from the blank template.

Scope

Two branches, Nashik and Pune, for four weeks. For each machine the website shows “Free as of this morning”, “Out, due back on a date” or “Call the branch”, with the date of the spreadsheet it came from. An “Ask to hire” button sends an enquiry to the branch.

Acceptance criteria

  • By 09:00 each working day, the website matches that morning's spreadsheet for both branches. Arvind checks twenty machines a week against the spreadsheet.
  • Every availability shown carries the date of the spreadsheet it came from.
  • If a branch's spreadsheet is missing or cannot be trusted, every machine at that branch shows “Call the branch”. Yesterday's data is never shown as today's.
  • A row that cannot be read is left out, counted and listed in a morning report to Arvind. The import never guesses.
  • Rows shown plus rows left out equals the rows in the spreadsheet.
  • Counter staff do nothing they do not already do.

Exclusions

  • Booking and payment on the website.
  • The other four branches.
  • Prices, delivery slots and customer accounts.
  • Replacing the spreadsheets.

What to notice. The template asks for criteria someone other than you can check, and for exclusions that stop the pilot growing. Each criterion names what is compared with what, and the first exclusion is the thing the sponsor originally asked for, stated plainly.

5. Design decision

Architecture decision record: how availability reaches the website

Day 6. Headings from the blank template.

Context

Availability changes once a day and lives in branch spreadsheets that staff will keep using. Three options were considered.

Option A: counter staff enter each hire and return in a new web form as it happens. Option B: read each branch's spreadsheet from the shared folder every morning. Option C: replace the spreadsheets with a hire management product.

Decision

Option B. It publishes the only availability anyone can stand behind, the morning's, and asks nothing new of the branches. Option A was rejected because it doubles the typing and would still be wrong between a return and its inspection. Option C was rejected because it cannot be chosen, bought and adopted in six weeks; it may be the right answer after the pilot.

Diagram

  • Branch spreadsheet, saved to the shared folder at closing.
  • 07:30: the import reads each branch's file using that branch's settings.
  • Each row is checked. Good rows go to the availability table; rows that cannot be read go to the morning report.
  • If a file is missing or refused, that branch is switched to “Call the branch”.
  • The website reads the availability table. The morning report goes to Arvind by email.

Consequences

  • Easier: adding a branch is one settings entry, provided its spreadsheet has the common layout.
  • Harder: the website is at most a day behind, and has to say so on every line.
  • Harder: enquiries are not bookings, so a branch still has to answer each one.
  • To watch: the import depends on the shape of files that people edit by hand. The morning report is the only warning that a file has changed.

What to notice. The template asks for the options considered and for what gets harder. The rejected options are kept with the reason each lost, and the last consequence names the weak point. In the second week of the pilot, that weak point is where the incident happened.

6. The code

The import is small: read a branch's rows, check each one, publish the good ones and report the rest. This is how the first version read a date. It is the part that failed.

// First version: every branch's dates are read day first.
function readDate(text) {
  const [day, month, year] = String(text).trim().split("/").map(Number);
  const date = new Date(Date.UTC(year, month - 1, day));
  return Number.isNaN(date.getTime()) || month > 12 ? null : date;
}

It meets the acceptance criteria as written: a date it cannot read is left out and counted. What it does not do is doubt a date it can read.

7. The incident

In the second week of the pilot the website showed seven Nashik machines as free when they were out on hire.

  1. Tue 10 March. The Nashik counter laptop is replaced. The new one is set to a United States region, so the spreadsheet now saves dates month first.
  2. Wed 11 March, 07:30. The import runs. The morning report lists 11 rows it could not read, out of 184. The two mornings before, it listed none.
  3. Thu 12 March, 07:30. The report lists 12 unreadable rows.
  4. Thu 12 March, 11:10. Joseph phones Arvind: a contractor has arrived for a mini excavator the website shows as free. It is on a site until 3 April.
  5. Thu 12 March, 11:40. Nashik is switched to “Call the branch”.
  6. Fri 13 March. The fix and its test are in place. The laptop's region is corrected.
  7. Tue 17 March. Nashik is switched back on after two clean mornings.

Incident root-cause report: wrong availability at Nashik

Written on Fri 13 March, sent to Meera, Arvind and Lata. Headings from the blank template.

Containment

At 11:40 on Thu 12 March every Nashik machine was switched to “Call the branch”, thirty minutes after Joseph's call. Pune was checked against its spreadsheet and left on.

Impact statement

One branch, two mornings. Seven machines that were out on hire were shown as free. Two contractors sent enquiries for them; one came to the branch. No money was taken, because the website takes none. Known from comparing all 184 Nashik rows on the website with the spreadsheet for both mornings.

Evidence review

  • Morning reports: 0, 0, 11 and 12 unreadable rows on 9, 10, 11 and 12 March.
  • The 11 unreadable rows on 11 March all had a first number of 12 or less and a second number above 12, such as 03/13/2026.
  • The spreadsheet file from 11 March was last saved on a different machine from the file of 10 March.
  • The mini excavator's row read 04/03/2026. Joseph's hire slip says it is due back on 3 April.

Root cause

The import read every date day first and accepted any date that was possible. When the laptop began saving dates month first, a date such as 3 April was written 04/03 and read, without complaint, as 4 March, which had already passed, so the machine was shown as free.

It looked acceptable because the dates that could not be read were handled exactly as agreed: left out, counted and reported. The report had no level at which it meant “stop”. Eleven unreadable rows after two mornings of none was the warning, and nothing was set to act on it.

Corrective control

  • Each branch's settings now state the order its dates are written in. If any date in a file is impossible in that order but possible in the other, the whole file is refused and the branch shows “Call the branch”.
  • If more than 2% of a file's rows cannot be read, the file is refused in the same way.
  • A refused file sends Arvind and the branch manager a message that says why.

Regression test

A file of month-first dates given to a branch set to day first must be refused whole, including the dates that could be read either way. The test fails on the first version of the import and passes on the corrected one. It is shown below.

Restoration criteria

  • Nashik's file passes the import on two consecutive mornings.
  • Arvind's sample of twenty machines matches the spreadsheet on both mornings.

Customer communication

Meera, Arvind and Lata were told by phone on Thursday and sent this report on Friday: what was wrong, for how long, how many machines and contractors, and what has changed. Joseph phoned both contractors on Thursday. The contractor who came to the branch was offered a larger machine at the same rate.

What to notice. The template asks for the underlying cause and for why the failure looked acceptable at the time. The report does not stop at the laptop. It says the design let a readable but wrong date through, and that the warning existed and nobody was asked to act on it.

The regression test

test("a sheet written month-first is refused whole, including the dates that could be read either way", () => {
  const rows = [
    { item: "Mini excavator 02", dueBack: "04/03/2026" }, // 3 April, written month-first: reads as 4 March
    { item: "Scissor lift 07", dueBack: "03/13/2026" } // 13 March, written month-first: no 13th month
  ];
  const result = importBranch(rows, nashik);
  assert.equal(result.refused, "date order does not match the branch setting");
  assert.deepEqual(result.accepted, []);
});

The corrected import

function importBranch(rows, branch) {
  const other = branch.dateOrder === "day-first" ? "month-first" : "day-first";
  const accepted = [];
  const rejected = [];
  for (const row of rows) {
    const dueBack = row.dueBack === "" ? null : readDate(row.dueBack, branch.dateOrder);
    if (row.dueBack !== "" && dueBack === null) {
      // A date that only makes sense the other way round means the whole sheet is in the
      // other order, so the rows that did parse cannot be trusted either.
      if (readDate(row.dueBack, other)) return { refused: "date order does not match the branch setting", accepted: [], rejected: rows };
      rejected.push(row);
      continue;
    }
    accepted.push({ item: row.item, dueBack });
  }
  if (rejected.length > rows.length * branch.maxRejectedShare) return { refused: "too many unreadable rows", accepted: [], rejected };
  return { refused: null, accepted, rejected };
}

A mistyped date such as 32/01 is impossible in either order, so it still costs one row. A date that is only possible the other way round is evidence about the whole file, so it costs the file.

8. Executive readout

Executive readout

End of week 4, one page, for Meera. Headings from the blank template.

Outcome

  • Availability calls at the two branches fell from 212 in the week before the pilot to 131 in week 4, by the counter tally.
  • Arvind's weekly samples: 80 machines checked, 80 matched, on the mornings the branch was switched on.
  • The site was wrong for Nashik on two mornings (11 and 12 March). Nashik then showed “Call the branch” until 17 March.
  • Not measured: whether enquiries turned into hires more often than phone calls do.

Risks and mitigations

  • A spreadsheet changes shape again. A file that does not fit its branch's settings is now refused and the branch shows “Call the branch”.
  • The data is a day old. Every line carries its date, and nothing is promised: the button sends an enquiry.
  • One person, Arvind, reads the morning report. A second reader is needed before more branches join.

Rollout plan

  • Weeks 5–6: add the two other branches with the common layout, one a week, each after two clean mornings.
  • Then: the two branches with extra columns, only after their managers agree to the common layout.
  • Checkpoint before each branch: Arvind's sample of twenty.

Operating model and cost

Arvind's team owns the morning report and the branch switch. Each branch manager owns their spreadsheet. The cost is driven by people's time: about ten minutes a morning to read the report, plus the weekly sample.

Decision requested

Approve adding the next two branches in weeks 5 and 6, and name the second reader of the morning report.

What to notice. The template asks for no claim you cannot back with evidence and for one decision. The readout reports the two bad mornings beside the result, says what was not measured, and ends with a single request.

9. Handover

One page for the people who run it after the engineer has gone. There is no template for this one; the test is whether Arvind could act on it at 07:45 with nobody to ask.

What runs, and when

  • 07:30 on working days: the import reads each branch's file from the shared folder.
  • By 07:45: the morning report is in Arvind's inbox.

When a branch shows “Call the branch”

  • Read the reason in the message: file missing, date order, or too many unreadable rows.
  • Ask the branch manager to correct the spreadsheet. Do not edit their file for them.
  • The branch comes back by itself on the next morning its file passes.

Adding a branch

  • Confirm its spreadsheet has the common columns.
  • Add its settings: folder, date order, and the share of unreadable rows allowed.
  • Leave it on “Call the branch” until two mornings pass and a sample of twenty matches.

Known limits

  • A date that is wrong but possible in the branch's own order, such as a mistyped month, is still accepted. Only the weekly sample would catch it.
  • Nothing checks that a machine marked free has been inspected. That stays with the branch.

What this example can and cannot show

It can show the shape of the work and what each document is for. It cannot show how you would behave when a real customer is unhappy, and reading it is not practice. To build your own, start from the blank templates and the portfolio project guide. For how the questions in step 3 are asked in interviews, see the interview questions guide. To do this kind of work on a simulated customer and have it checked, see FDE practice on DrillHall, or try one decision free.